Showing posts with label arcadis. Show all posts
Showing posts with label arcadis. Show all posts

Thursday, October 16, 2014

Arcadis wins Bid to Contruct Next Phase of Cal High Speed Rail

ARCADIS, and their parent company, ARCADIS NV, are respected industry leaders in construction management, design and consulting. Some of their past projects include the Germany Ebensfeld-Erfurt High-Speed Rail, Los Angeles Metropolitan Transit Authority’s Metro Regional Connector Transit Corridor, the Port of Long Beach’s Middle Harbor. Phase 1 construction, U.S. Army Corps of Engineers Hurricane Katrina Levee Reconstruction and the Chicago Transit Authority’s Wilson Transfer Station Reconstruction. ARCADIS U.S. Inc. is headquartered in Highlands Ranch, Colorado, but will open an office in the Central Valley. ARCADIS meets the Authority’s aggressive 30 percent goal for Small Business (SB) participation, with a commitment of 30.5 percent. In addition, the company surpasses the Authority’s 10 percent Disadvantaged Business Enterprise (DBE) and 3 percent Disadvantaged Veteran Business Enterprise (DVBE) goals; reaching a 15.6 percent and a 4.8 percent commitment, respectively. Work on CP 2-3 will extend in excess of 60-miles through the Central Valley beginning at East American Avenue in Fresno and continuing south to approximately one mile north of the Tulare-Kern County line. The route will bring thousands of jobs to the Central Valley, an area with one of the highest unemployment rates in California and the nation, provide environmental benefits, relieve roadway congestion and spur economic development.

Monday, September 1, 2014

Cal High Speed Rail has been approved for another 114 Miles From Bakersfield to Fresno which adds to the Connection from Madera to Fresno

This is an article in part by Reuters from a CalHighSpeedRail press release. California's high-speed passenger rail project won approval from federal officials at the Surface Transportation Board on Tuesday to construct a 114-mile section from Fresno to Bakersfield. The line will be the second section of a larger statewide high-speed rail line plan, which runs 500 miles from San Francisco to the Los Angeles basin. The Central Valley stretch will be subject to environmental considerations, noted the Surface Transportation Board, which regulates railroad and transportation matters. On Tuesday, the California High-Speed Rail Authority announced it had selected ARCADIS U.S. Inc to oversee a 60-mile section of rail from Fresno to the Tulare and Kern County line. ARCADIS would be responsible for the design and construction oversight and could receive nearly $72 million for the work over a five-year period, according to the California High-Speed Rail Authority. The total $68 billion high-speed rail project is estimated to be completed by 2029 and will transport passengers across the state in under three hours. The state has already started construction on a 29-mile stretch from Madera to Fresno. (Reporting By Robin Respaut reuters